
Decontamination
Controlled work areas and site decontamination support.
Equipment and procedures for hazardous asbestos work where containment, cleaning and worker welfare matter.
EquipmentH type vacs, masks, breathing systems, negative air movers
Site setupEnclosures, airlocks and decontamination units
Temporary enclosures
Before hazardous asbestos materials are removed, a temporary sealed enclosure can be constructed around the work zone, with appropriate airlocks, smoke tests and extraction planning.
Specialist cleaning
Rhodes uses specialist vacuum cleaners capable of removing very small hazardous particles, alongside PPE and breathing systems appropriate to the task.
Decontamination units
Trailer-based units support safe decontamination after exposure to hazardous materials, with separated changing, showering and exit areas.
Planning work in an occupied or sensitive building?
Talk through the site constraints early so the control setup is right from the start.
